📌 Current Construction Progress
• Masonry works up to the 13th Floor completed
• 80% of the external wall hacking/surface preparing has been done
🚧 Ongoing Operations
• 🧱Masonry works on the 14th Floor are actively progressing
• Remaining work of the external wall hacking/surface preparing ongoing
• Internal wall plastering work preparation ongoing
• ⚡ Initial MEP rough-in works, including electrical wiring and water supply preparation ongoing
📝 BuildInsight
Hacking/Surface preparation for Plastering Key
Hacking for plaster key is a surface preparation technique used to create controlled indentations on concrete walls before plastering. This roughened texture forms a strong mechanical bond between the wall and the plaster layer, ensuring long-term adhesion. The process helps prevent cracking, peeling, or detachment over time while supporting a smoother, stronger, and more durable final finish. Incorporating this step reflects our commitment to delivering reliable and lasting quality in every detail.
✨ Moving Forward with Confidence
Each phase is progressing with careful planning and engineering supervision, reflecting our commitment to delivering a well-structured, high-quality living space. From structural works to interior detailing, every step is approached with precision, responsibility, and respect for craftsmanship. Our workflow remains aligned with Bayfancy’s vision of creating a refined, modern home defined by clarity, comfort, and long-term durability, ensuring thoughtful design, superior workmanship, and a quiet, confident journey toward completion.
CONTACT US
email: sales@bayfancy.com
WhatsApp: +960 94 999 18
Landline: +960 400 1188
website: www.bayfancy.com