Bayfancy Residence – 12F Slab completed
Update
30th-July-2025
🏢 Bayfancy Residence – 12F Slab completed
📅 30th July 2025
📈 Current Construction Progress:
• ✅ Completion of 12F slab concrete pouring
• 🧱 The construction of internal partition walls on the 3rd floor has been completed
⚙️ Ongoing Operations:
• 🔨 Reinforcement and formwork installation for the 13th floor slab in progress
• � The construction of interior partition walls on the 4th floor has been 50% completed
🏗️ Architectural Technique: Waterproof & Moisture-Resistant Construction
In high-humidity areas such as 🍳 kitchens, 🚽 bathrooms, and 🌿 balconies, a 20cm reinforced concrete base wall is systematically installed to:
• 🛡️ Block moisture penetration
• 💧 Prevent liquid leakage
• 🏋️ Enhance structural stability
Functioning as an impermeable barrier, this concrete foundation effectively safeguards walls against water damage and moisture erosion, significantly extending the building's service life.
✨ Bayfancy Residence remains steadfast in its mission to "create personalized smart luxury living" meticulously crafting benchmark-quality residences.
👷 Bayfancy team consistently dedicated to refining residential environments and crafting superior lifestyles for our residents.